More Info

One of the

latest projects

Share it
alt

NEW BUILDS

From the ground up, NikaDevs Building Company can provide the complete

EXTENSIONS

Double, single, side, back. Whatever the extension required to your property

INTERIOR FINISHES

Our projects look just as good on the inside. High quality interior finishing for

From idea to real

construction

We provide global integrated construction and facility management services. Our clients entrust us to deliver safe, quality projects that stand the test of time with over 145 years of building relationships, communities and families. Our customers are safe in the knowledge..

Look our pricingLook our pricingLook our pricingDownload PDFDownload PDFDownload PDF

LARGEST COMPANY
Since 1964

Years of building relationships

Completed
Projects

1989, Feb 21

A convincing business idea is the basis for almost every successful company launch.

1992, Aug 16

To be able to enter your company into the commercial register, all foundation documents and the letter of deposit must be authenticated and certified through a notary.

1996, Jul 05

In order to carry out the business formalization process, we require a letter of deposit of the deposited share capital.

2009, Jun 22

The implementation of the company formalization begins with the drafting of all necessary documents (articles of association, official record etc.).

LOAD MORE
{"timelines_type":"type_5","dynamic_content":"y","image_size":"full","custom_items":"","orderby":"date","order_direction":"ASC","filters":[{"filter_type":"post_type","post_type":"post","taxonomies":"category","taxonomy_values":"timeline","post_status":"draft"},{"filter_type":"post_status","post_type":"post","taxonomies":"category","taxonomy_values":"timeline","post_status":"publish"},{"filter_type":"taxonomies","post_type":"post","taxonomies":"category","taxonomy_values":"history","post_status":"publish"},{"filter_type":"numberposts","post_type":"post","taxonomies":"category","taxonomy_values":"timeline","post_status":"publish","numberposts":"4"}],"title_val":"post_date","description_val":"post_excerpt","items_per_load":4,"top_delimiter":""}

Our Team &

Partners

With over fifty years of experience, Berserk builder NikaDevs and his two sons Ber and Serk strive for perfection in all aspects of their work. It is their sole

View team pageView team pageView team page
alt
alt
alt
alt
Our Projects

Carrying out the job

Joint venture between Keller and ground engineering and foundation works specialist Intrafor, which is part of Bouygues Construction.

Dame Judith Hackitt’s

Final report has made a number of recommendations that will have significant implications for the construction industry if or when they are passed into law.

Changes to product testing

Changes to product testing, documentation requirements and points at which a building must be approved safe, could also all have big ramifications on industry.

Changes to product testing

Changes to product testing, documentation requirements and points at which a building must be approved safe, could also all have big ramifications on industry.

Aquatic: Stock Photography from Under The Sea

Deep below the ocean's surface there is a vibrant, vast ecosystem full of life: a rich diversity of marine life.

As widely expected, Hackitt has declined to proscribe

Her report instead says it is for the construction industry to 'respond to the [building regulations] by shaping detailed guidance to support the delivery of those outcomes.'

Wickside project will deliver

The practices’ Wickside project will deliver 475 homes and 300 jobs on a 2.9ha former waste transfer site at Hackney Wick.

The final report by Dame Judith Hackitt

Fire and Rescue Authorities (FRAs) and the Health and Safety Executive (HSE), to oversee the approval and regulation of buildings higher than 10-storeys.

BUJ Architects and Ash Sakula Architects

Olympic Park that falls under the remit of the London Legacy Development Corporation.
Our Reviews
Vestibulum fringilla pede sit amet augue. In turpis. Pellentesque posuere.
Praesent turpis. Aenean posuere, tortor sed cursus feugiat.

Ostin Paterson

As widely expected, Hackitt has declined to proscribe the use of flammable materials in cladding systems, despite widespread calls for her to do so. Her report instead says it is for the construction industry to 'respond to the [building regulations] by shaping detailed guidance to support the delivery of those outcomes.'

Anna Jonson

The final report by Dame Judith Hackitt, published this morning, recommends the creation of a new organisation, made up of Local Authority Building Control (LABC), Fire and Rescue Authorities (FRAs) and the Health and Safety Executive (HSE), to oversee the approval and regulation of buildings higher than 10-storeys.

Jacson Mit

The A$11bn (?6.2bn) Metro Tunnel Project in Melbourne is set to see the creation of a second underground train route through the central business district and the creation of five new underground stations.

Mike Paterson

Changes to product testing, documentation requirements and points at which a building must be approved safe, could also all have big ramifications on industry.
  • Diamond
  • Delicious
  • G & G
  • Codepen

Foundation of the company

The review of fire safety rules undertaken in the wake of Grenfell tower has proposed the creation of 'less prescriptive' regulation and cutting out private sector Approved Inspectors from performing building control.

Promoting products and services

The final report by Dame Judith Hackitt, published this morning, recommends the creation of a new organisation, made up of Local Authority Building Control (LABC), Fire and Rescue Authorities (FRAs).

BUJ Architects and Ash Sakula Architects

BUJ Architects and Ash Sakula Architects have won planning permission for a huge mixed-use development near the Olympic Park that falls under the remit of the London Legacy Development Corporation.

The practices’ Wickside project will deliver

The development will deliver 39 new buildings of up to eight storeys in height, including a craft brewery, a foundry, an art gallery, a food quarter and a canalside park. Final report recommends new approval body for buildings

The final report by Dame Judith Hackitt

Published this morning, recommends the creation of a new organisation, made up of Local Authority Building Control (LABC), Fire and Rescue Authorities (FRAs) and the Health and Safety Executive (HSE).

A Keller joint venture has snagged

The A$11bn (?6.2bn) Metro Tunnel Project in Melbourne is set to see the creation of a second underground train route through the central business district and the creation of five new underground stations.

The team carrying out the job will be a 50:50

Joint venture between Keller and ground engineering and foundation works specialist Intrafor, which is part of Bouygues Construction.

Dame Judith Hackitt’s

Final report has made a number of recommendations that will have significant implications for the construction industry if or when they are passed into law.